( Item # = PG0188 ) Gas Turbine Generator GE Frame 6 PG6561 42.1MW 60Hz |
---|
Gas
Turbine Generator GE Frame 6 42.1MW 60Hz -
Form to request more Information - New Frame 6 Gas Turbine Generator Package Fuel
Pressure Natural Gas 350 psig required
Steam injection to 25ppm @ 15%02 and ISO conditions: Fuel Pressure Natural Gas 350 psig
required
The following is noted as part of
our offer:
TWO (2) GE PG6561 turbine generator set: The basic scope of supply is quoted F.O.B. STORAGE. Offer is valid for 30 days from date of proposal, while unit is available. All taxes, duties, etc. are excluded from the quotation. Standard equipment only terms and conditions apply. Full Warranty (parts & Labour) will be applicable. This excludes travel and expenses.
1 x PG6561B CONFIGURATION This performance statement applies specifically to the scope of equipment supplied under the terms of this Contract. Since the Contract scope of supply is limited to a gas turbine unit only, the statement has been amended to reflect the ISO rating of the unit at the load coupling flange (i.e. no allowance has been made for load gear or generator losses). 1. The performance of the plant is estimated as follows: ? Base Load Output (mechanical) : 40,950 kWm ? Base Load Heat Rate (mechanical) :10,930 kJ/kWh 2. These estimated figures will be obtained when the following operating/ambient conditions apply: (i) Gas Turbine Unit : Frame PG6561 (ii) Ambient Temperature : 15°C (iii) Atmospheric Pressure : 1.013 bar (A) (iv) Humidity : 60% (v) Fuel : Fuel gas 50,031
kJ/kg LHV
(vi) NOx control : Standard combustion, unabated NOx (vii) Inlet Pressure Drop :
100 mmH20
(viii) Power Factor : 0.80 pf (ix) The estimated output will be applicable at the gas turbine load coupling flange. 3. This estimated Performance is subject to the following: (i) All figures for the performance
are bona fide estimates.
(ii) Each test to establish the estimated figures shall be made when a) The gas turbine is new, clean and in proper working condition b) The fuel has an acceptable quality as specified above c) The Contractor is witness to the test. (iii) The tests, procedure and method of measurement (including margins to cover errors on observation and measurement to establish the performance shall be agreed before commencement of the tests and shall be based on the recommendations of ASME PTC22 Performance Test Code Gas Turbine Power Plant, 1985 Edition. (iv) Method of measurement of ambient air temperature and ambient pressure shall be agreed. (v) All performance tests shall unless otherwise agreed, be carried out immediately following the date that the equipment is ready for such tests. (vi) If the equipment fails
to achieve the estimated figures by a significant margin, the Contractor
shall be given every facility at the earliest opportunity to determine
the source of the failure. If such failure lies within the Contractors
responsibility, the Contractor shall use its best endeavors to undertake
remedial action.
The following are the Terminal Points associated with the foregoing Scope of Supply. Mechanical (i) Gas Turbine Combustion air
inlet plenum flange connection
(ii) Gas Turbine Drains Diesel engine fuel tank drain N20
(iii) Fire Protection Fill connections on CO2 bottles (iv) Ventilation Inlet and outlet grilles on unit
enclosure
(i) Turbine Skid Junction box terminals
(ii) Turbine Control Panel Power supply terminals
This tender covers the design, manufacture, shop testing (where appropriate) and delivery F.O.B. STORAGE as detailed below: Option 1 Gas Turbine Equipment One (1) Frame PG6561, Model B single shaft heavy duty industrial type gas turbine unit suitably packaged for outdoor operation and complete with the following on-base equipment and systems: a) Diesel engine starting device, inclusive of driving clutch, torque converter and electro-hydraulic rotor turning device. b) Standard combustion system, suitable for natural gas to KEL specification GEI 41040F and with steam injection for NOx emissions control to 25 ppmvd @ 15% 02. c) On-base self-contained lubricating oil system designed to meet the requirements of the gas turbine, load gearbox and generator with dual 100% filters and dual oil/water coolers. The main pump will be a positive displacement gear type driven from the accessory gearbox. Separate auxiliary and emergency AC and DC motor driven pumps will also be provided. Piping will be stainless steel downstream of filters. d) Shaft driven main hydraulic oil pump. e) Shaft driven cooling water pump. f) CO2 fire protection system for the gas turbine accessory, turbine and load gearbox compartments and comprising nozzles, heat detectors, piping, wiring and 100% storage bottles to be located in a rack immediately adjacent to the gas turbine. g) Acoustic enclosure for gas turbine, to meet 85 dB(A) at 1 metre, and complete with set of walkways and access stairs to KEL standard format. h) Compartment heating and pressurized ventilation system. i) Velocity type vibration detectors. j) Gas detection system. k) On/off line compressor washing systems. l) Exhaust frame blowers. m) Load coupling. One (1) Gas turbine control panel (Speedtronic MkV) One (1) Set of foundation bolts, sole plates and hardware for equipment offered. Option 2 Gas Turbine Equipment One (1) Frame PG6561, Model B single shaft heavy duty industrial type gas turbine unit, suitably packaged for outdoor operation and complete with the following on-base equipment and systems. a) Diesel engine starting device, inclusive of driving clutch, torque converter and electro-hydraulic rotor turning device. b) Standard combustion system, suitable for natural gas to KEL specification GEI 41040F and with steam injection for NOx emissions control to 25 ppmvd @ 15% 02. c) On-base self-contained lubricating oil system designed to meet the requirements of the gas turbine, load gearbox and generator with dual 100% filters and dual oil/water coolers. The main pump will be a positive displacement gear type driven from the accessory gearbox. Separate auxiliary and emergency AC and DC motor driven pumps will also be provided. Piping will be stainless steel downstream of filters. d) Shaft driven main hydraulic oil pump. e) Shaft driven cooling water pump. f) CO2 fire protection system for the gas turbine accessory, turbine and load gearbox compartments and comprising nozzles, heat detectors, piping, wiring and 100% storage bottles to be located in a rack immediately adjacent to the gas turbine. g) Acoustic enclosure for gas turbine, to meet 85 dB(A) at 1 metre, and complete with set of walkways and access stairs to KEL standard format. h) Compartment heating and pressurized ventilation system. i) Velocity type vibration detectors. j) Gas detection system. k) On/off line compressor washing systems. l) Exhaust frame blowers. m) Load coupling. One (1) Gas turbine control panel (Speedtronic MkV). One (1) Set of foundation bolts, sole plates and hardware for equipment offered |
Cork board for Workers Compensation Board - This site is a link to the Workers Compensation cork board not part of or approved by the Ontario WSIB Workplace Safety Insurance Board of Ontario WSIB
Worker Compensation, no part of Workplace Safety Insurance Board WSIB - This is a cork board for WSIB worker compensation, no part of or paid for WSIB Workplace Safety Insurance Board Ontario Canada
Province of Ontario Business Advisory Watch - This is a Ontario business advisory for clients and associate businesses with finical interest in the Province of Ontario or that are planing on investing in future business within Ontario
Workers Compensation Insurance information board - Cork Board for Workers Compensation Insurance no affiliation with the Workplace Safety Insurance Board of Ontario (WSIB)
Workers
Compensation WSIB Cork Board - Workers Compensation information cork
board isn't financed by WSIB Workplace Safety Insurance Board of Ontario